Poe_005.jpg

644 Charlotte

Detroit, MI 

Key Project Facts: 

Demolished and rebuilt the South Facing Wall

We modified the existing foundation and rebuilt the south elevation wall with brick veneer on a block backup wall.  Our work included all limestone and structural steel. 

Replaced Window Sills

We also installed new limestone window sills into 199 openings.  This included supplying the limestone and setting it in mortar with rubberized flashing below the mortar joint and installing silicone joint sealant on the horizontal surface of sill joints.